The investigation could review the authorisation process, potential responsibilities and whether any alleged irregularities affect the project.
The construction of the new Casino Dreams in Talca faces further legal scrutiny after Casino de Talca filed a criminal complaint asking prosecutors to investigate the permits and authorisations granted for the project.
The development is located close to the Cajón del Río Claro and Estero Piduco Urban Wetland. It has attracted controversy because construction progressed without the project entering Chile’s Environmental Impact Assessment System.
Attorney Juan Carlos Manríquez, representing Casino de Talca, said the complaint seeks a reconstruction of the administrative process to establish whether all relevant information was fully disclosed to the authorities.
According to the complainant, some public bodies may have received incomplete or inconsistent information. These allegations have not been proven and it will be for prosecutors and, if applicable, the courts to determine whether any criminal conduct occurred.
Excavation depths questioned
One issue raised concerns the depth of excavations described during the authorisation process. The complaint alleges that documents referred to excavation depths of approximately 1.4 to 1.6 metres, while parts of the completed work may have approached three metres.
Manríquez said the difference could be relevant when determining whether statements submitted to the authorities accurately described the planned and completed works.
Juan Carlos Manríquez, attorney representing Casino de Talca, said:
“We are not simply talking about a difference of a few centimetres. This is one of several elements that could help establish whether the declarations made to the authorities accurately reflected the characteristics of the works.”
He stressed that any criminal liability would depend on establishing what information was submitted, who provided it, what the different participants knew and what work was ultimately carried out.
The complaint refers to possible offences involving false statements or falsified public documents. However, no such offence has been established and responsibility for assessing the evidence rests with the Public Prosecutor’s Office.
Wider review of the permit process
The legal action does not focus solely on the companies involved in construction. It asks prosecutors to examine the broader authorisation process, including the participation of private parties and public officials.
Manríquez said investigators should establish which documents were submitted, who prepared them, which officials reviewed them and what information supported each authorisation.
The complaint also raises the possible consequences if a court were eventually to find that an essential permit had been obtained through unlawful conduct. Chile’s Law 21.595 on economic and environmental crimes contains provisions that may apply to authorisations secured using false or unlawful information.
Any effect on the validity of the permits or continuation of construction would nevertheless require decisions by the appropriate authorities or courts.
Complaints consolidated
Casino de Talca had previously filed a criminal complaint seeking an investigation into possible environmental offences, false statements, public or private corruption and offences covered by legislation on economic crime and corporate criminal liability.
Talca prosecutors have reportedly consolidated the two complaints into a single case. The allegations do not establish wrongdoing, and no suspension of construction or existing authorisations had been announced at the time of publication.